A to Z Search 
CONTACT US
1-800-TUV-0123
A Subsidiary of TÜV SÜD
|
|
Thermal Shock Module
TYPICAL OPERATIONAL SEQUENCE
- Roll TSM into position under the AGREE Chamber.
- Connect electric power and 80 PSI filtered, clean, oil-free air to TSM.
- Position moving platform in cold position and load in unit under test.
- Close the chamber door and precondition cold and hot chambers (approx. 2hrs). Cold temp is supplied by AGREE refrigeration system.
- System switch on TSM panel is energized and Wallow Programmer/Controller initiates the cycle.
- Moving platform is lowered to the hot position - transfer time is 3-5 seconds (adjustable).
- Moving platform will remain in hot position for required time.
- Moving platform is raised to cold position and held for the programmed time.
- This cycle pattern will continue under the command of the programmer/controller.
- The moving platform and the unit under test will be in the cold chamber position at the end of the final cycle.
- Cold chamber temperature will be reduced to ambient by AGREE heater, chamber door is opened and unit under test will be removed.
|
Back to Thermal Shock Module |
For more information, contact
us.
|
|
|
|